Construction product approval process
Construction Quality Planning Guide, Draft for Consultation, Published by the Construction Innovation Hub in May 2020, defines the Construction Product Approval Process (CPAP) as: ‘An adaptation of Production Part Approval Process (PPAP) that is aimed at those enterprises that will feed construction with new componentry for offsite builds.’
The Production Part Approval Process is: ‘A process, standardised by both the automotive and aerospace industries, that outlines the steps and requirements for approval of production designs and/or manufacturing processes throughout the product development cycle. It also ensures that the entire supply chain understands these steps when procuring externally manufactured parts.’
[edit] Related articles on Designing Buildings
- Advanced product quality planning.
- Bill of quantities breakdown structures.
- Construction Innovation Hub.
- Construction quality planning.
- Plan, Do, Check, Act (PDCA).
- Poka-yoke.
- Product Breakdown Structure.
- Product design requirements.
- Product validation.
- Project quality plan.
- Quality control.
- Quality in construction projects.
- Quality.
- Six Sigma.
Featured articles and news
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.